
PROJECT
MARCH 2019 DRILL RESULTS
Program Highlights:
​
-
Numerous significant gold assays obtained
-
Repetition of historical high-grade assays achieved
-
Confirmation of geological model
The drilling program was designed to validate the historic drill results, to gain an understanding of the mineralization controls as well as to test strike length and the depth of mineralization.
​
DRILL RESULTS
Drill Hole
Zone
From (m)
To (m)
Length (m)
Grade (Au g/t)
EOH m
GK19-001
Deloye
45.63
48.62
2.99
1.61
141.1
GK19-002
Deloye
0
NSV
82.64
GK19-003
C
137
139.45
2.45
21.33
151
Including
137
137.5
0.5
103
-
GK19-004
C
43.6
44.5
0.9
10.4
195.38
GK19-004
C
84.68
85.78
1.1
4.35
-
GK19-005
C
56.96
57.96
1
7.75
179.03
GK19-005
C
104.85
105.8
0.95
6.56
-
GK19-006
C
0
NSV
168.83
GK19-007
C
97.58
98.58
1
104.5
175.92
GK19-008
A
65.24
70.61
5.37
9.04
154.77
Including
65.24
66.24
1
42.7
-
GK19-009
A
74.64
88.1
13.46
1.12
160.77
Including
79.53
80.88
1.35
4.9
-
GK19-010
A
45.42
46.42
1
0.66
118.8
80
81.5
1.5
1.46
-
GK19-011
A
79.8
85.27
5.47
1.75
182.08
Including
79.8
81
1.2
4.03
-
GK19-012
A
Abandoned
58.77
GK19-013
A
37.5
38.5
1
6.47
96.41
93
94.28
1.28
1.72
-
GK19-014
A
56.5
60
3.5
1.71
181.38
GK19-015
A
79.69
82.7
3.01
1.73
175.89